Performance:
1 Pile Driving Function: YC Series Crawler Pile Driver is designed to install and maintain the highway anti-collision guard rails and guardrail posts. It is also used for the installation of photovoltaics (PV), solar cells and panels.
2 Pile Extracting Function: With the same hydraulic system for extracting poorly driven or incorrectly positioned posts in road maintenance work, it is a professional machine for extraction of posts from any surface condition.
3 Pile Drilling Function: This equipment can drill holes into the concrete, rock, granite and other very hard road materials, and then easily install the posts.
Specifications:
|
Model |
Unit |
YC180 |
YC230 |
YC330 |
Pile Driver and Extractor |
Hammer Rating |
Joule |
400-500 |
600-800 |
900-1400 |
Hammer Weight |
Kg |
180 |
230 |
330 |
Blows per minute |
Times |
350-780 |
600-900 |
500-735 |
Horse Power |
HP |
22 |
24 |
32 |
Working Pressure |
Mpa |
10-13 |
10-17 |
9-13 |
Oil Flow |
L/min. |
30-55 |
36-65 |
45-65 |
Oil Tank Capacity |
L |
100 |
100 |
120 |
Weight |
Kg |
2500 |
2600 |
2900 |
Size (L*W*H) |
Mm |
2300*3200*1900 |
Traveling Speed |
km/h |
0-8 |
Tow Speed |
km/h |
0-50 |
Pile Extracting Force |
KN |
20 |
30 |
35 |
Pile Driller |
Size (L*W*H) |
Mm |
3200*350*250 |
Weight |
Kg |
300 |
310 |
320 |
Air Flow |
m3/min. |
10 |
13 |
18 |
Diamter of Drilling Holes |
Mm |
120 |
150 |
200 |
Max. Drilling Depth |
Mm |
1700 |
Working efficiency |
mm/min. |
About 250 |
Main components:
(1) Hydraulic pump
(2) Hydraulic motor
(3) Multidirectional control valves and centralized hydraulic control rods
(4) Changchai brand diesel engine
(5) Hydraulic hammer and hammer adapter
(6) Pile extractor
Shipping:
One 20' container can load two sets of YC series pile drivers.
On-Site Usage: